Estimator Expert logo

Reviews

Client Reviews

Reviews from the contractors, subcontractors, developers and restoration firms whose bids we price. Pricing follows current supplier and labor rates for your area, so the client reviews figures hold up when an owner questions them.

24–48 hrs

Typical turnaround

CSI 01–33

Divisions covered

USA & Canada

Full coverage

Fixed fee

Quoted up front

Client feedback

Our client reviews

Real feedback on turnaround, accuracy and how easy the deliverables are to check on bid day.

4.9rating score, based on 15 client reviews
Mark Ellison, General Contractor
Mark Ellison24 June 2026
We were turning down invitations because nobody had time to price them. Now the takeoff comes back inside two days with the plans marked up, so reviewing it takes an hour instead of a weekend.
General Contractor , Houston, TX
Luis Moreno, Concrete Subcontractor
Luis Moreno19 June 2026
Formwork contact area and rebar weight are broken out properly, which is exactly what I need to check the number against my own crew rates.
Concrete Subcontractor , Dallas, TX
Andre Whitfield, Electrical Contractor
Andre Whitfield11 June 2026
Device and fixture counts matched what we found in the field. The panel schedule pricing saved us a full day of work on bid week.
Electrical Contractor , Atlanta, GA
Karen Delgado, Property Developer
Karen Delgado2 June 2026
We used them for a feasibility budget before design was finished. Every assumption was written down clearly, so our lender could follow how the number was built.
Property Developer , Phoenix, AZ
Dan Prescott, Restoration Contractor
Dan Prescott27 May 2026
Xactimate scopes come back on the current price list with the sketch attached, and adjuster approvals have gone through without pushback.
Restoration Contractor , New Orleans, LA
Rachel Kim, Steel Fabricator
Rachel Kim18 May 2026
Tonnage and connection counts were accurate on a complex frame. Revisions after the addendum came back the next morning.
Steel Fabricator , Columbus, OH
Greg Halvorsen, Project Manager, Commercial GC
Greg Halvorsen6 May 2026
We hand over the plan set and get back a clean line-item estimate with exclusions spelled out. On the last two jobs their number landed within three percent of the awarded cost.
Project Manager, Commercial GC , Denver, CO
Simone Carter, Principal Architect
Simone Carter28 April 2026
They priced three design options for us at schematic stage and the value engineering notes changed what we specified. Our client finally understood the cost of each choice.
Principal Architect , Charlotte, NC
Ramon Vega, Plumbing Contractor
Ramon Vega19 April 2026
Fixture counts, pipe lengths by size, and hangers were all listed separately. I could plug my own labor rates straight in and bid the same day.
Plumbing Contractor , San Antonio, TX
Arun Patel, Civil Engineer
Arun Patel8 April 2026
Earthwork cut and fill volumes were backed up with the surfaces they used. That level of detail made the owner's review painless.
Civil Engineer , Sacramento, CA
Emily Brandt, Interior Finishes Contractor
Emily Brandt30 March 2026
Drywall, paint, and flooring quantities came back room by room with waste factors shown. Ordering material off their takeoff has cut our overages right down.
Interior Finishes Contractor , Nashville, TN
Kenji Nakamura, Mechanical Contractor
Kenji Nakamura21 March 2026
Ductwork by gauge and equipment tags matched the schedules exactly. Turnaround was under 48 hours even with a revised mechanical set.
Mechanical Contractor , Seattle, WA
Andre Watkins, Project Manager, General Contractor
Andre Watkins2 July 2026
Three bids in one week and every takeoff landed on time. The line items follow our own cost codes, so plugging the numbers into our bid form takes minutes.
Project Manager, General Contractor, Atlanta, GA
Rachel Doyle, Commercial Developer
Rachel Doyle27 June 2026
Their budget estimate at the concept stage kept us from designing a building we could not afford. Clear allowances, clear exclusions, and a summary our lender accepted.
Commercial Developer, Denver, CO
Imran Sheikh, Mechanical Contractor
Imran Sheikh23 June 2026
Piping and equipment counts were checked against the schedules before delivery. We won the job and the field crew is working straight off their marked drawings.
Mechanical Contractor, Chicago, IL

See how we would price your next bid

Send the drawings and get a fixed fee and delivery date back the same day. Estimates in 24 – 48 hours.

Call Now