Estimator Expert logo
Commercial construction site at dusk with steel frame, tower crane and concrete formwork

Construction estimating across the USA & Canada

Bid more.
Win more.

Construction cost estimating, quantity takeoff and CPM scheduling support for general contractors, subcontractors, builders and developers. Send your plans, get a CSI-divided estimate back in 24 – 48 hours at a fixed fee.

  • CSI Divisions 01–33
  • Residential, commercial & industrial
  • Excel + marked-up PDF delivery
  • Support through bid day
  • Cost estimating
  • Quantity takeoff
  • CPM scheduling
  • Bid management
  • MEP estimating
  • Concrete & rebar
  • Drywall & framing
  • Insurance restoration
  • Cost estimating
  • Quantity takeoff
  • CPM scheduling
  • Bid management
  • MEP estimating
  • Concrete & rebar
  • Drywall & framing
  • Insurance restoration
Estimator marking up construction blueprints with quantity takeoff measurements

24 – 48 hours

Typical estimate turnaround

Who we are

A Field-Trained Construction Estimating Team for Busy Contractors

Our field-trained construction estimating team works the same way your bid room does. Plans come in, every quantity is measured on screen, scope gaps are flagged in writing, and the numbers are priced using current regional labor and material rates. Busy contractors receive an editable workbook, marked-up drawings and a clear list of inclusions and exclusions instead of black-box software output or generic unit costs pulled from a national average.

30+ trades

Trade-specific crews

Div 01–33

CSI coverage

Serving USA & Canada

Full coverage

Trades covered

Every division, every trade package

Whether you need a whole-project estimate or a single trade scope, our construction estimating team prices every division using trade-specific waste factors and crew productivity rates.

Explore trades

Recent work

Representative projects

A sample of project types and turnaround times across residential, commercial, industrial and insurance restoration work.

Commercial project: Mid-Rise Office Core & Shell

Commercial

Mid-Rise Office Core & Shell

Full CSI estimate, Divisions 01–33

Size
84,000 SF · 6 storeys
Turnaround
3 business days
Residential project: Custom Single-Family Residence

Residential

Custom Single-Family Residence

Trade-package estimate with allowances

Size
4,600 SF · 2 storeys
Turnaround
36 hours
Industrial project: Distribution Warehouse

Industrial

Distribution Warehouse

Earthwork, tilt-up shell and site utilities takeoff

Size
210,000 SF
Turnaround
4 business days

CSI MasterFormat

Divisions we measure and price

Full-project estimates or a single division scope, measured from your drawings and priced with zip-code level material and labour rates.

  • Div 02–03

    Sitework, concrete & rebar

    Demolition, earthwork cut/fill, footings, slabs, walls, formwork and rebar weights by bar size.

  • Div 04–05

    Masonry & structural steel

    CMU, brick veneer, structural steel tonnage, joists, deck, miscellaneous metals and connections.

  • Div 06–07

    Carpentry, roofing & envelope

    Framing lumber lists, sheathing, insulation, air barriers, roofing systems and waterproofing.

  • Div 08–09

    Openings & finishes

    Doors, windows, storefront, drywall, ceilings, stucco, flooring and paint by room schedule.

  • Div 21–23

    Fire protection, plumbing & HVAC

    Sprinkler heads and mains, fixture counts, pipe runs, ductwork, equipment and controls.

  • Div 26–33

    Electrical & site utilities

    Panels, feeders, branch wiring, devices, lighting, low-voltage, site power and wet utilities.

How it works

Plans in, bid-ready numbers out

Three steps, no software to buy and no long-term contract.

  1. 01

    Send your plans

    Upload drawings, specs and any bid documents. PDF, DWG or a shared link all work.

  2. 02

    Get a fixed quote

    We review the scope and reply with a fixed fee and a firm delivery date, usually within a few hours.

  3. 03

    Receive the estimate

    CSI-divided Excel estimate plus colour-coded marked-up drawings, with support through bid day.

What you get

Deliverables built for bid day

Everything arrives in editable formats your team already uses, backed by marked-up drawings so every line is traceable.

  • CSI-divided Excel estimate with editable formulas and unit rates
  • Colour-coded marked-up PDF drawings for every measured item
  • Separate material, labour, equipment and subcontractor columns
  • Overhead, profit, waste factors and contingency shown as line items
  • Delivery in your own bid template or cost-code structure on request
  • Scope-gap and plan-discrepancy notes flagged before you submit

Software: Planswift · Bluebeam · Trimble · RS Means · Xactimate · FastPIPE / FastDUCT

Pricing

Fixed fees, quoted before we start

You get a written price and turnaround up front. No hourly billing, no surprise invoices, revisions on the same scope included.

See pricing

Single trade takeoff

From $200

One division or trade scope, ideal for subcontractors bidding a focused package.

Full project estimate

Custom quote

Residential, commercial, industrial and civil projects priced by drawing count and scope.

Monthly estimating desk

From $1,500/mo

A dedicated estimator covering roughly 10–12 bids a month at about 60% of in-house cost.

Who we work with

Built for the people who own the number

General contractors, trade subs, builders, developers, architects and owners across the USA and Canada.

  • General contractors

    Bid more work without adding payroll, with numbers you can defend to the owner.

  • Subcontractors

    Trade-correct quantities and waste factors so your margin survives the buyout.

  • Builders & developers

    Budget models early, hard numbers later, and cost control through construction.

  • Architects & owners

    Independent cost checks at design milestones and value-engineering options.

Client feedback

Our client reviews

Contractors, developers and design teams who bid with our takeoffs and estimates.

4.9rating score, based on 15 client reviews
Mark Ellison, General Contractor
Mark Ellison24 June 2026
We were turning down invitations because nobody had time to price them. Now the takeoff comes back inside two days with the plans marked up, so reviewing it takes an hour instead of a weekend.
General Contractor, Houston, TX
Luis Moreno, Concrete Subcontractor
Luis Moreno19 June 2026
Formwork contact area and rebar weight are broken out properly, which is exactly what I need to check the number against my own crew rates.
Concrete Subcontractor, Dallas, TX
Andre Whitfield, Electrical Contractor
Andre Whitfield11 June 2026
Device and fixture counts matched what we found in the field. The panel schedule pricing saved us a full day of work on bid week.
Electrical Contractor, Atlanta, GA
Karen Delgado, Property Developer
Karen Delgado2 June 2026
We used them for a feasibility budget before design was finished. Every assumption was written down clearly, so our lender could follow how the number was built.
Property Developer, Phoenix, AZ
Dan Prescott, Restoration Contractor
Dan Prescott27 May 2026
Xactimate scopes come back on the current price list with the sketch attached, and adjuster approvals have gone through without pushback.
Restoration Contractor, New Orleans, LA
Rachel Kim, Steel Fabricator
Rachel Kim18 May 2026
Tonnage and connection counts were accurate on a complex frame. Revisions after the addendum came back the next morning.
Steel Fabricator, Columbus, OH
Greg Halvorsen, Project Manager, Commercial GC
Greg Halvorsen6 May 2026
We hand over the plan set and get back a clean line-item estimate with exclusions spelled out. On the last two jobs their number landed within three percent of the awarded cost.
Project Manager, Commercial GC, Denver, CO
Simone Carter, Principal Architect
Simone Carter28 April 2026
They priced three design options for us at schematic stage and the value engineering notes changed what we specified. Our client finally understood the cost of each choice.
Principal Architect, Charlotte, NC
Ramon Vega, Plumbing Contractor
Ramon Vega19 April 2026
Fixture counts, pipe lengths by size, and hangers were all listed separately. I could plug my own labor rates straight in and bid the same day.
Plumbing Contractor, San Antonio, TX
Arun Patel, Civil Engineer
Arun Patel8 April 2026
Earthwork cut and fill volumes were backed up with the surfaces they used. That level of detail made the owner's review painless.
Civil Engineer, Sacramento, CA
Emily Brandt, Interior Finishes Contractor
Emily Brandt30 March 2026
Drywall, paint, and flooring quantities came back room by room with waste factors shown. Ordering material off their takeoff has cut our overages right down.
Interior Finishes Contractor, Nashville, TN
Kenji Nakamura, Mechanical Contractor
Kenji Nakamura21 March 2026
Ductwork by gauge and equipment tags matched the schedules exactly. Turnaround was under 48 hours even with a revised mechanical set.
Mechanical Contractor, Seattle, WA
Andre Watkins, Project Manager, General Contractor
Andre Watkins2 July 2026
Three bids in one week and every takeoff landed on time. The line items follow our own cost codes, so plugging the numbers into our bid form takes minutes.
Project Manager, General Contractor, Atlanta, GA
Rachel Doyle, Commercial Developer
Rachel Doyle27 June 2026
Their budget estimate at the concept stage kept us from designing a building we could not afford. Clear allowances, clear exclusions, and a summary our lender accepted.
Commercial Developer, Denver, CO
Imran Sheikh, Mechanical Contractor
Imran Sheikh23 June 2026
Piping and equipment counts were checked against the schedules before delivery. We won the job and the field crew is working straight off their marked drawings.
Mechanical Contractor, Chicago, IL

FAQ

Common questions

Turnaround, pricing, formats and what happens after the bid goes in.

Ready to price your next project?

Send your drawings and get a fixed quote back before any work starts. Estimates typically delivered in 24 – 48 hours.

Call Now